MJA Zahrani – Our Projects
Asphalt work, Road Marking and road traffic sign
Asphalt is a mixture of aggregates, binder and filler.
– It is produced in a plant that heats, dries and mixes aggregate, bitumen and sand into a composite mix
– Asphalt is used for constructing and maintaining roads, parking areas, railway tracks, ports, airport runways, bicycle lanes, sidewalks and also play- and sport areas
– Compared to paving materials like bricks, slabs or pavers, asphalt has more flexibility to shape to curves and corners, allowing for a tight seal with and kerbing and reducing the gaps where water and debris can penetrate.
Asphalt results in a smoother and more durable asphalt road surface than a bitumen-sealed road, Asphalt work step as the coming steps:
Preparation:
- Surveying work
- Subgrade Preparation and compaction
- Base course work
Asphalt Paving:
- Binder Course
- Wearing Course
- Compaction
- Curing
- Road marking
- Road traffic sign